Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 6, 2018, 09:51 AM
  • 05 1366_05 1365 _06112018_015202.mp4

Date
11/06/2018
W/O
735012
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00444
PipeID
P06583
Time
1:51 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6210
Sewer Name
05 GARDENA PUMP TRUNK
City
GARDENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_735012_TV05295_NOV2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 1365
Downstream MH
05 1366
Dir. of Survey
Upstream
Length Surveyed
365.2 ft.
Total Length
365.2 ft.
Structural Index
3
Structural Quick
3N00
Structural Rating
219
O&M Index
1
O&M Quick
1200
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
221
Pipe schematic from manhole 05 1365 to 05 1366
MH: 05 1365MH: 05 1366upstream0 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - 05 13660 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK42 ft. RFJ - Roots Fine Joint, at 01 o'clock, within 8 inches of joint: YES65.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"86.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"116.7 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"165.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"214 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"263.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"314.3 ft. RFJ - Roots Fine Joint, at 12 o'clock, within 8 inches of joint: NO318.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"360.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"363.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start365.2 ft. MWM - Water Mark, 30 %of cross sectional area365.2 ft. AMH - Downstream Manhole, Survey Begins - 05 1365365.2 ft. MWL - Water Level, 10 %of cross sectional area

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
2.1SAP
299.7TFC
5TFC
46.9TF
279.1TF
365.2SAP
365.2AMH05 1366
248.5TF
50.9RFJ
365.2MGOCONNECTION AT MH 9 O'CLOCK
323.2RFJ
199.7TFC
0MWM
0AMH05 1365
151.2TFC
101.6TFC
0MWL

Properties (4)

additional_info
SC365238
custom_field_two
2
customer
LACSD
datetime
2018-11-06T01:51:25-08:00