Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 7, 2018, 09:28 AM
  • 05 1358_05 1357 _07112018_012823.mp4

Date
11/07/2018
W/O
735012
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00444
PipeID
P06574
Time
1:28 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6212
Sewer Name
05 GARDENA PUMP TRUNK
City
GARDENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_735012_TV05295_NOV2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 1358
Downstream MH
05 1357
Dir. of Survey
Downstream
Length Surveyed
326.9 ft.
Total Length
326.9 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
195
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
199
Pipe schematic from manhole 05 1358 to 05 1357
MH: 05 1358MH: 05 1357downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 13580 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 5 %of cross sectional area2.3 ft. MGO - General Observation - MAG COAT3.5 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start15.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"38.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"74.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"82.2 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"82.2 ft. RBL - Roots Ball Lateral, at 12 o'clock, 70 %116.4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"158.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"218.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"271.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"321.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"326.8 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish326.9 ft. AMH - Downstream Manhole, Survey Ends - 05 1357

Observation photos (1)

  • Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    3.5 ft. - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
82.2TF
218.7TFC
74.6TFC
326.8SAV
0AMH05 1358
82.2RBL
321.2TFC
15.3TFC
116.4TF
158.8TF
271.2TFC
326.9AMH05 1357
3.5SAV
38.8TFC
0MWL
0MWM
2.3MGOMAG COAT

Properties (4)

additional_info
SC365240
custom_field_two
3
customer
LACSD
datetime
2018-11-07T01:28:31-08:00