Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 12, 2017, 11:58 AM
  • H 1284_H 1283 _01122017_040040.mp4

Date
01/12/2017
W/O
613652
Weather
Light Rain
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01183
PipeID
P17300
Time
3:58 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4209
Sewer Name
H JOINT OUTFALL H - UNIT 8L
City
AZUSA
Loc. details
Sidewalk
Location Code
F
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
11
Purpose
Routine Assessment
Project
WO_613652_TV22154_JAN2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
H 1284
Downstream MH
H 1283
Dir. of Survey
Downstream
Length Surveyed
301.6 ft.
Total Length
301.6 ft.
Structural Index
3
Structural Quick
5F3K
Structural Rating
480
O&M Index
2
O&M Quick
2K00
O&M Rating
120
Overall Index
3
Overall Quick
Overall Rating
600
Pipe schematic from manhole H 1284 to H 1283
MH: H 1284MH: H 1283downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 128470 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start0 ft. MWL - Water Level, 15 %of cross sectional area3.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start7.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start52.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"68.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"114.2 ft. SRV - Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: YES, Start125.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"230.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"239 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"300.9 ft. SRV - Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: YES, Finish300.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish300.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish300.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish301.6 ft. AMH - Downstream Manhole, Survey Ends - H 1283

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    3.4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.4 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: YES, Start

    114.2 ft. - Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
300.9SRV
52.4TFC
230.3TFC
239TFC
300.9DAGS
300.9SAV
0AMHH 12847
0MWM
300.9SSS
0DAGS
114.2SRV
7.4SAV
3.4SSS
125.2TFC
301.6AMHH 1283
0MWL
68.8TFC

Properties (6)

additional_info
SC306711
custom_field_two
2
customer
LACSD
datetime
2017-01-12T03:58:16-08:00
documentation
PRO PIPE
is_lateral_inspection
false