Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 13, 2017, 08:06 AM
  • H 1289_H 1288 _01132017_000617.mp4

Date
01/13/2017
W/O
613652
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01183
PipeID
P17305
Time
12:06 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4210
Sewer Name
H JOINT OUTFALL H - UNIT 8L
City
AZUSA
Loc. details
Sidewalk
Location Code
F
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
12
Purpose
Routine Assessment
Project
WO_613652_TV22154_JAN2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
H 1288
Downstream MH
H 1289
Dir. of Survey
Upstream
Length Surveyed
312.4 ft.
Total Length
312.4 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
310
O&M Index
2
O&M Quick
2K00
O&M Rating
124
Overall Index
2
Overall Quick
Overall Rating
434
Pipe schematic from manhole H 1288 to H 1289
MH: H 1288MH: H 1289upstream0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Ends - H 12891.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish1.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish1.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish310.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start310.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start310.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start312.4 ft. MWL - Water Level, 20 %of cross sectional area312.4 ft. MWM - Water Mark, 20 %of cross sectional area312.4 ft. AMH - Upstream Manhole, Survey Begins - H 1289

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
311.3SSS
0MWL
311.3DAGS
312.4MGOACTIVE CONNECTION AT MH 9 O'CLOCK
0MWM
2SAP
2DAGS
2SSS
312.4AMHH 1289
0AMHH 1289
311.3SAP

Properties (6)

additional_info
SC306712
custom_field_two
3
customer
LACSD
datetime
2017-01-13T00:06:09-08:00
documentation
PRO PIPE
is_lateral_inspection
false