Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 1, 2016, 09:09 AM
  • E 0182_E 0181_01112016_020956.mp4

Date
11/01/2016
W/O
597391
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00972
PipeID
P24763
Time
2:09 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3869
Sewer Name
E JOINT OUTFALL E - UNIT 4 RELIEF
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
13
Purpose
Routine Assessment
Project
WO_597391_TV01092_OCT2016
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
E 0182
Downstream MH
E 0181
Dir. of Survey
Downstream
Length Surveyed
320.7 ft.
Total Length
320.7 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
3124
O&M Rating
11
Overall Index
2
Overall Quick
Overall Rating
11
Pipe schematic from manhole E 0182 to E 0181
MH: E 0182MH: E 0181downstream0 ft. MGO - General Observation - LATERAL AT MH 9 OCLOCK ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - E 01820 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2.2 ft. DAE - Deposits Attached Encrustation, 5%of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start12.7 ft. ISSRH - Intruding Sealing Ring Hanging, 5 %of cross sectional area, from 10 to 02 o'clock137.7 ft. OBN - Obstacles Construction Debris, 20 %of cross sectional area, from 04 to 08 o'clock, Start - NOT VISIBLE213.3 ft. ISSRH - Intruding Sealing Ring Hanging, 5 %of cross sectional area, from 10 to 02 o'clock317.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish317.6 ft. OBN - Obstacles Construction Debris, 20 %of cross sectional area, from 04 to 08 o'clock, Finish317.6 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Finish320.7 ft. MGO - General Observation - ROACHES IN MH320.7 ft. MGO - General Observation - LATERAL AT MH 9 OCLOCK ACTIVE320.7 ft. AMH - Downstream Manhole, Survey Ends - E 0181

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5%of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES, Start

    2.2 ft. - Deposits Attached Encrustation, 5%of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start

  • Intruding Sealing Ring Hanging, 5 %of cross sectional area, from 10 to 02 o'clock

    12.7 ft. - Intruding Sealing Ring Hanging, 5 %of cross sectional area, from 10 to 02 o'clock

  • Intruding Sealing Ring Hanging, 5 %of cross sectional area, from 10 to 02 o'clock

    213.3 ft. - Intruding Sealing Ring Hanging, 5 %of cross sectional area, from 10 to 02 o'clock

Observations (15)

DistanceCodeObservation
2.2DAGS
0MGOLATERAL AT MH 9 OCLOCK ACTIVE
12.7ISSRH
0AMHE 0182
0MWM
320.7MGOROACHES IN MH
0MWL
137.7OBNNOT VISIBLE
320.7MGOLATERAL AT MH 9 OCLOCK ACTIVE
213.3ISSRH
317.6DAGS
317.6OBN
2.2DAE
320.7AMHE 0181
317.6DAE

Properties (7)

additional_info
SC301949
custom_field_two
4
customer
LACSD
datetime
2016-11-01T02:09:25-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
37692