Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 29, 2017, 05:40 AM
  • D 0107_D 0106 _28092017_224038.mpg

Date
09/28/2017
W/O
658185
Weather
Dry
Operator/Surveyor
CORTEZ ESTEBAN
Sewer ID
Z00156
PipeID
P10013
Time
10:40 PM
Certificate
U-209-8148
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4946
Sewer Name
D JOINT OUTFALL D - UNIT 6
City
LAWNDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
16
Purpose
Routine Assessment
Project
WO_658185_TV05172_SEP2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
D 0107
Downstream MH
D 0106
Dir. of Survey
Downstream
Length Surveyed
554 ft.
Total Length
554 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole D 0107 to D 0106
MH: D 0107MH: D 0106downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - D 01070 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH13.4 ft. MGO - General Observation - MAGNEZIUM H.O COATING start550.2 ft. MGO - General Observation - MAGNEZIUM H.O COATING finish554 ft. AMH - Downstream Manhole, Survey Ends - D 0106554 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH554 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH

Observations (10)

DistanceCodeObservation
13.4MGOMAGNEZIUM H.O COATING start
550.2MGOMAGNEZIUM H.O COATING finish
0MWL
554AMHD 0106
0MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
554MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
0MWM
0AMHD 0107
554MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH
0MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH

Properties (5)

additional_info
SC345854
custom_field_two
4
customer
LACSD
datetime
2017-09-28T22:40:20-07:00
is_lateral_inspection
false