Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 22, 2017, 08:15 AM
  • 29 0294A_29 0294 _22092017_013152.mp4

Date
09/22/2017
W/O
658119
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00375
PipeID
P24205
Time
1:15 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4887
Sewer Name
29 ORANGE AVENUE SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Routine Assessment
Project
WO_658119_TV29040_SEP2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0294
Downstream MH
29 0294A
Dir. of Survey
Upstream
Length Surveyed
334.8 ft.
Total Length
334.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 29 0294 to 29 0294A
MH: 29 0294MH: 29 0294Aupstream0 ft. AEP - End of Pipe - 29 0294A0.9 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"3.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"56.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"59.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"96 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"98.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"145.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"148.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"205.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"208.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"251.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"254.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"311.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"314.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"334.8 ft. MWM - Water Mark, 5 %of cross sectional area334.8 ft. AMH - Downstream Manhole, Survey Begins - 29 0294334.8 ft. MWL - Water Level, 5 %of cross sectional area

Observations (18)

DistanceCodeObservation
238.8TFC
80.5TFC
23.3TFC
278.4TFC
20.6TF
333.9TF
236.2TFC
186.7TFC
0MWM
189.3TFC
129.4TFC
331.2TF
0AMH29 0294
83.1TFC
334.8AEP29 0294A
275.6TFC
126.5TFC
0MWL

Properties (7)

additional_info
SC345947
custom_field_two
4
customer
LACSD
datetime
2017-09-22T01:15:17-07:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
39295