Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 21, 2017, 09:10 AM
  • 29 0283A_29 0283 _21092017_023415.mp4

Date
09/21/2017
W/O
658119
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00375
PipeID
P24193
Time
2:10 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4886
Sewer Name
29 ORANGE AVENUE SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Routine Assessment
Project
WO_658119_TV29040_SEP2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0283A
Downstream MH
29 0283
Dir. of Survey
Downstream
Length Surveyed
290.4 ft.
Total Length
290.4 ft.
Structural Index
3
Structural Quick
3J00
Structural Rating
168
O&M Index
3
O&M Quick
3100
O&M Rating
3
Overall Index
3
Overall Quick
Overall Rating
171
Pipe schematic from manhole 29 0283A to 29 0283
MH: 29 0283AMH: 29 0283downstream0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 29 0283A0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK8.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start12.1 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"63.5 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 6"66.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"89.5 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6"95.2 ft. RML - Roots Medium Lateral, from 02 to 03 o'clock, 25 %, within 8 inches of joint: NO95.2 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"152.3 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"191.1 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"193.8 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"200.3 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"214.5 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 6"259 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"290.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish290.4 ft. AMH - Downstream Manhole, Survey Ends - 29 0283

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8.3 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
193.8TFC
290.4CM
0MGOCONNECTION AT MH 3 O'CLOCK
95.2RML
259TFC
191.1TFC
0AMH29 0283A
214.5TF
8.3CM
66.2TFC
0MWM
0MWL
200.3TB
0MGOCONNECTION AT MH 9 O'CLOCK
152.3TFC
290.4AMH29 0283
89.5TF
12.1TFC
63.5TF
95.2TFA

Properties (7)

additional_info
SC345946
custom_field_two
3
customer
LACSD
datetime
2017-09-21T02:10:03-07:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
39295