Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 16, 2016, 10:58 AM
  • 19 0103_19 0102_20160316_041337.mp4

Date
03/16/2016
W/O
557968
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00722
PipeID
P15295
Time
3:58 AM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3225
Sewer Name
19 EAST ARTESIA TRUNK, SECTS 1,2,3,&5
City
CERRITOS, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
07
Purpose
Routine Assessment
Project
WO_557968_TV19021_2016MAR
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
19 0103
Downstream MH
19 0102
Dir. of Survey
Downstream
Length Surveyed
186.8 ft.
Total Length
186.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
6
Pipe schematic from manhole 19 0103 to 19 0102
MH: 19 0103MH: 19 0102downstream0 ft. MGO - General Observation - LATERAL AT MH 3 OCLOCK0 ft. MWM - Water Mark, 65 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 19 01030 ft. MWL - Water Level, 5 %of cross sectional area10.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start126.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"176.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"184 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish186.8 ft. AMH - Downstream Manhole, Survey Ends - 19 0102186.8 ft. MGO - General Observation - LATERAL AT MH 3 OCLOCK

Observations (10)

DistanceCodeObservation
0MGOLATERAL AT MH 3 OCLOCK
126.5TFC
0MWM
186.8AMH19 0102
10.9DAGS
0AMH19 0103
184DAGS
186.8MGOLATERAL AT MH 3 OCLOCK
176.6TFC
0MWL

Properties (6)

additional_info
SC305316
custom_field_two
4
customer
LACSD
datetime
2016-03-16T03:58:26-07:00
documentation
PRO-PIPE
is_lateral_inspection
false