18 0309_18 0308_12132018_034659.mp4
2 ft. - General Observation - MAG COAT 70% START
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING CONCRETE
3 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
10.3 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC
30.7 ft. - Surface Reinforcement Visible, from 12 to 01 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
45.3 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR
66.1 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - PEELED CONCRETE
74.4 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO, Start - SEVERE AGG
76 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR
| Distance | Code | Observation |
|---|---|---|
| 23.8 | TFC | Capped |
| 2 | MGO | MAG COAT 70% START |
| 3 | SAV | SEVERE AGG |
| 79.6 | SRV | LONG CIRCUM REBAR |
| 135.2 | SAM | SEVERE AGG |
| 120.4 | TFC | Capped |
| 135.2 | SSS | BLISTERING PEELING CONCRETE |
| 74.4 | SAM | SEVERE AGG |
| 135.2 | SAV | SEVERE AGG |
| 53.1 | SRC | LONG CIRCUM REBAR |
| 0 | MWL | — |
| 76 | SRV | LONG CIRCUM REBAR |
| 135.2 | MGO | MAG COAT 70% FINISH |
| 66.1 | DSZ | PEELED CONCRETE |
| 30.7 | SRV | CIRCUM REBAR |
| 0.1 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 135.7 | AMH | 4:10AM |
| 72.3 | TFC | Capped |
| 0 | MWM | — |
| 10.3 | SAV | SEVERE AGG SPORATIC |
| 0 | AMH | 3:45AM |
| 2 | SSS | PEELING BLISTERING CONCRETE |
| 45.3 | SRC | LONG CIRCUM REBAR |