18 0314_18 01267_12132018_015406.mp4
0 ft. - General Observation - MAG COAT 90% START 9:00 TO 3:00
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING CONCRETE
10.8 ft. - Surface Spalling, from 11 to 02 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
10.8 ft. - Surface Aggregate Visible, from 11 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC
16.6 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES - PEELING CONCRETE IN SHEETS
60.8 ft. - General Observation - MAG COAT 50% START
64.7 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETEIN SHEETS
67 ft. - Surface Aggregate Visible, from 09 to 12 o'clock, within 8 inches of joint: NO - SEVERE AGG
70.1 ft. - Surface Reinforcement Visible, from 11 to 12 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
88.3 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC
88.3 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
121.3 ft. - Surface Reinforcement Visible, from 11 to 12 o'clock, within 8 inches of joint: NO, Start - CIRCUM REBAR
137.5 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - LONG & CIRCUM REBAR
137.5 ft. - General Observation - MAG COAT 20% START
143.4 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - PEELING CONCRETE
199.3 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - PEELING CONCRETE
| Distance | Code | Observation |
|---|---|---|
| 244.2 | MGO | MAG COAT 20% FINISH |
| 10.8 | SSS | PEELING CONCRETE |
| 10.8 | SAV | SEVERE AGG SPORATIC |
| 16.6 | SSS | PEELING CONCRETE IN SHEETS |
| 244.2 | SSS | PEELING BLISTERING CONCRETE |
| 70.1 | SRV | CIRCUM REBAR |
| 0 | MWL | — |
| 64.7 | SSS | PEELING CONCRETEIN SHEETS |
| 143.4 | DSZ | PEELING CONCRETE |
| 137.5 | SRV | LONG & CIRCUM REBAR |
| 88.3 | SAV | SEVERE AGG SPORATIC |
| 0 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 244.8 | AMH | 2:20AM |
| 88.3 | SSS | PEELING CONCRETE |
| 199.3 | DSZ | PEELING CONCRETE |
| 2 | SSS | PEELING BLISTERING CONCRETE |
| 244.2 | SAV | SEVERE AGG |
| 121.3 | SRV | CIRCUM REBAR |
| 0 | AMH | 1:40AM |
| 125.1 | SRV | CIRCUM REBAR |
| 60.8 | MGO | MAG COAT 50% START |
| 67 | SAV | SEVERE AGG |
| 0 | MGO | MAG COAT 90% START 9:00 TO 3:00 |
| 0 | MWM | — |
| 137.5 | MGO | MAG COAT 20% START |