08 0000_08 646_12122018_014052.mp4
2 ft. - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: NO - 50% PIPE LOSS OR MORE
2 ft. - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - 50% OR MORE PIPE LOSS
7.3 ft. - General Observation - 30" CIP
36.9 ft. - General Observation - ZOOM 5'
41.2 ft. - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - 50% OR MORE PIPE LOSS
41.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: NO, Finish
41.8 ft. - Downstream Manhole, Survey Ends - 2:15AM
| Distance | Code | Observation |
|---|---|---|
| 41.8 | AMH | 2:15AM |
| 7.3 | MGO | 30" CIP |
| 2 | SCP | 50% PIPE LOSS OR MORE |
| 21.6 | DAGS | — |
| 36.9 | MGO | ZOOM 5' |
| 2 | SCP | 50% OR MORE PIPE LOSS |
| 41.2 | SCP | 50% OR MORE PIPE LOSS |
| 0 | MWM | — |
| 16.8 | SCP | 50% OR MORE PIPE LOSS |
| 0 | MWL | — |
| 41.2 | DAGS | — |
| 0 | AMH | 1:30AM |