Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 12, 2018, 08:40 AM
  • 08 0001_08 0000_12122018_010454.mp4

Date
12/12/2018
W/O
0743262
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00561
PipeID
P21471
Time
12:40 AM
Certificate
U-1-14-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1075
Sewer Name
08 MAIN STREET P.P. INFLUENT SEWER
City
CARSON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
10
Purpose
Capital Improvement Program Assesment
Project
20181212MDM_MAIN_STREET_P_P_INFLUENT_SEWER
Material
CIP
Shape
Circular
Height
30 in.
Upstream MH
08 0001
Downstream MH
08 0000
Dir. of Survey
Downstream
Length Surveyed
15.8 ft.
Total Length
15.8 ft.
Structural Index
4
Structural Quick
5241
Structural Rating
20
O&M Index
5
O&M Quick
5100
O&M Rating
5
Overall Index
4
Overall Quick
Overall Rating
25
Pipe schematic from manhole 08 0001 to 08 0000
MH: 08 0001MH: 08 0000downstream0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. MGO - General Observation - Conn. @ Mh, 12; O' Clock. Active0 ft. MWL - Water Level, 70 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 12:55AM0 ft. MWM - Water Mark, 80 %of cross sectional area2 ft. SRC - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - LONG & CIRCUM REBAR2 ft. SRC - Surface Reinforcement Corroded, from 09 to 11 o'clock, within 8 inches of joint: NO - CORRISIN BEYOUND REBAR2 ft. SAM - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG6 ft. SAM - Surface Aggregate Missing, from 1`0 to 02 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG6 ft. SCP - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - 50% OR MORE PIPE LOSS6 ft. SRC - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - LONG CIRCUM REBAR6 ft. MMC - Material Change, Cast Iron12.2 ft. SCP - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: NO - 50% OR MORE PIPE LOSS15.2 ft. SCP - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - 50% OR MORE PIPE LOSS15.8 ft. AMH - Downstream Manhole, Survey Ends - 1:15AM

Observation photos (5)

  • Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - LONG & CIRCUM REBAR

    2 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - LONG & CIRCUM REBAR

  • Surface Reinforcement Corroded, from 09 to 11 o'clock, within 8 inches of joint: NO - CORRISIN BEYOUND REBAR

    2 ft. - Surface Reinforcement Corroded, from 09 to 11 o'clock, within 8 inches of joint: NO - CORRISIN BEYOUND REBAR

  • Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - 50% OR  MORE PIPE LOSS

    6 ft. - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - 50% OR MORE PIPE LOSS

  • Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: NO - 50% OR MORE PIPE LOSS

    12.2 ft. - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: NO - 50% OR MORE PIPE LOSS

Observations (15)

DistanceCodeObservation
0MGOConn. @ Mh, 3 O' Clock. Active
2SRCLONG & CIRCUM REBAR
0MGOConn. @ Mh, 12; O' Clock. Active
0MWL
0AMH12:55AM
0MWM
2SRCCORRISIN BEYOUND REBAR
6SAMSEVERE AGG
15.2SCP50% OR MORE PIPE LOSS
2SAMSEVERE AGG
12.2SCP50% OR MORE PIPE LOSS
6SCP50% OR MORE PIPE LOSS
6SRCLONG CIRCUM REBAR
6MMC
15.8AMH1:15AM

Properties (4)

custom_field_three
CORRISON BEYOUND REBAR-50% METAL PIPE LOSS OR MORE
custom_field_two
1
customer
LACSD
datetime
2018-12-12T00:40:23-08:00