08 0687_08 0011_12102018_044312.mp4
2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG AREAS OF MISSING TILES
2 ft. - General Observation - MISSING TILES 100% START 8:00 TO 4:00
12.2 ft. - General Observation - 10% MISSING TILES START 9:00 TO 3:00
18.4 ft. - General Observation - 25% MISSING TILES START
22.3 ft. - Surface Aggregate Missing, from 01 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
30.9 ft. - General Observation - 60% MISSING TILES
43.4 ft. - General Observation - 10% MISSING TILES START
53.5 ft. - General Observation - 50% MISSING TILES START
64.3 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
102.9 ft. - General Observation - 60% MISSING TILES
117.2 ft. - General Observation - 60% MISSING TILES
133.4 ft. - Surface Reinforcement Visible, from 11 to 12 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
181.4 ft. - General Observation - 100% MISSING TILES 9:00 TO 3:00
182.9 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - LONG & CIRCUM REBAR
198.6 ft. - General Observation - 50% MISSING TILES
208.5 ft. - General Observation - 80% MISSING TILES
236.7 ft. - General Observation - 95% MISSING TILES START
239.5 ft. - Surface Reinforcement Corroded, from 12 to 03 o'clock, within 8 inches of joint: YES, Start - LONG & CIRCUM REBAR
245.5 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO, Start - LONG CIRCUM REBAR
| Distance | Code | Observation |
|---|---|---|
| 117.2 | MGO | 60% MISSING TILES |
| 0 | MGO | Conn. @ Mh, 3 O' Clock. OPEN-STOPLOG IN PLACE |
| 260.2 | SAM | SEVERE AGG AREAS OF MISSING TILES |
| 18.4 | MGO | 25% MISSING TILES START |
| 0 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 260.2 | SRC | LONG & CIRCUM REBAR |
| 141.8 | MGO | MISSING TILES 30% |
| 224.3 | MGO | 50% MISSING TILES |
| 0 | MWL | — |
| 245.5 | SRC | LONG CIRCUM REBAR |
| 0 | MWM | — |
| 2 | SAM | SEVERE AGG AREAS OF MISSING TILES |
| 0 | AMH | 4:45AM |
| 208.5 | MGO | 80% MISSING TILES |
| 236.7 | MGO | 95% MISSING TILES START |
| 2 | MGO | MISSING TILES 100% START 8:00 TO 4:00 |
| 181.4 | MGO | 100% MISSING TILES 9:00 TO 3:00 |
| 132.8 | TF | Open |
| 260.2 | MGO | 95% MISSING TILES FINISH |
| 53.5 | MGO | 50% MISSING TILES START |
| 30.9 | MGO | 60% MISSING TILES |
| 64.3 | SAM | SEVERE AGG |
| 157.8 | MGO | MISSING TILES 50% |
| 182.9 | SRV | LONG & CIRCUM REBAR |
| 198.6 | MGO | 50% MISSING TILES |
| 133.4 | SRV | CIRCUM REBAR |
| 260.7 | AMH | 5:25AM |
| 245.9 | SRC | LONG CIRCUM REBAR |
| 68.9 | MGO | 10% MISSING TILES START |
| 22.3 | SAM | SEVERE AGG |
| 239.5 | SRC | LONG & CIRCUM REBAR |
| 12.2 | MGO | 10% MISSING TILES START 9:00 TO 3:00 |
| 43.4 | MGO | 10% MISSING TILES START |
| 102.9 | MGO | 60% MISSING TILES |