Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 10, 2018, 09:08 AM
  • 08 0012_08 0687_12102018_015844.mp4

Date
12/10/2018
W/O
0741815
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00016
PipeID
P25022
Time
1:08 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1073
Sewer Name
08 MAIN STREET TRUNK
City
CARSON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
07
Purpose
Capital Improvement Program Assesment
Project
20181210MDM_MAIN_STREET_TRUNK
Material
RCP-CTL
Shape
Circular
Height
33 in.
Upstream MH
08 0012
Downstream MH
08 0687
Dir. of Survey
Downstream
Length Surveyed
40.6 ft.
Total Length
40.6 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
3
O&M Quick
3100
O&M Rating
3
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 08 0012 to 08 0687
MH: 08 0012MH: 08 0687downstream0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. OPEN0 ft. MWL - Water Level, 20 %of cross sectional area - NO FLOW SLUDGE0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. OPEN0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:55AM2 ft. MGO - General Observation - TILES 100% IN PLACE START2 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - MISSING TILES SLUDGE40 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - MISSING TILES SLUDGE40 ft. MGO - General Observation - ZOOM APPOX 40'40 ft. MGO - General Observation - TILES 100& IN PLACE FINISH40.6 ft. MSA - Survey Abandoned - 20% SLUDGE

Observation photos (4)

  • General Observation - TILES 100% IN PLACE START

    2 ft. - General Observation - TILES 100% IN PLACE START

  • Deposits Settled Other,  20 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start - MISSING TILES SLUDGE

    2 ft. - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - MISSING TILES SLUDGE

  • Deposits Settled Other,  20 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Finish - MISSING TILES SLUDGE

    40 ft. - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - MISSING TILES SLUDGE

  • General Observation - ZOOM APPOX  40'

    40 ft. - General Observation - ZOOM APPOX 40'

Observations (11)

DistanceCodeObservation
40DSZMISSING TILES SLUDGE
0MGOConn. @ Mh, 3 O' Clock. OPEN
40MGOZOOM APPOX 40'
40MGOTILES 100& IN PLACE FINISH
0MWLNO FLOW SLUDGE
2MGOTILES 100% IN PLACE START
0MGOConn. @ Mh, 9 O' Clock. OPEN
2DSZMISSING TILES SLUDGE
0MWM
0AMH1:55AM
40.6MSA20% SLUDGE

Properties (4)

custom_field_three
MISSING SEVERE AGG
custom_field_two
3
customer
LACSD
datetime
2018-12-10T01:08:41-08:00