Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 21, 2016, 10:31 AM
  • 14 0509_14 0508_12212016_023219.mp4

Date
12/21/2016
W/O
607706
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00579
PipeID
P18600
Time
2:31 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4040
Sewer Name
14 TRUNK "C"
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
19
Purpose
Routine Assessment
Project
WO_607706_TV14021_DEC2016
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0509
Downstream MH
14 0508
Dir. of Survey
Downstream
Length Surveyed
184.4 ft.
Total Length
184.4 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole 14 0509 to 14 0508
MH: 14 0509MH: 14 0508downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 05090 ft. MWL - Water Level, 40 %of cross sectional area0 ft. MWM - Water Mark, 60 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2.6 ft. MGO - General Observation - MAG COATING 80%7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"27.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"51 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"75.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"103.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"128.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"152.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"176.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"182.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish184.4 ft. AMH - Downstream Manhole, Survey Ends - 14 0508184.4 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK184.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COATING 80%

    2.6 ft. - General Observation - MAG COATING 80%

Observations (19)

DistanceCodeObservation
0AMH14 0509
0MWL
182.7SAP
184.4AMH14 0508
0MWM
51TFC
152.9TFC
2.6MGOMAG COATING 80%
184.4MGOACTIVE CONNECTION AT MH 3 O'CLOCK
27.1TFC
75.6TFC
184.4DAGS
128.1TFC
176.9TFC
7TFC
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
2SAP
2DAGS
103.6TFC

Properties (6)

additional_info
SC306438
custom_field_two
3
customer
LACSD
datetime
2016-12-21T02:31:55-08:00
documentation
PRO PIPE
is_lateral_inspection
false