Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 2, 2018, 04:25 PM
  • 05 0012_05 0011_122018_094933.mp4

  • 05 0012_05 0011_122018_095200.mp4

Date
01/02/2018
W/O
0674047
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00431
PipeID
P05297
Time
8:25 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7592
Sewer Name
05 DISTRICT #5 MAIN TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
30
Purpose
Routine Assessment
Project
20170102DF_DISTRICT_5_MAIN_TRUNK
Material
RCP-CTL
Shape
Circular
Height
54 in.
Upstream MH
05 0012
Downstream MH
05 0011
Dir. of Survey
Downstream
Length Surveyed
452.7 ft.
Total Length
452.7 ft.
Structural Index
4
Structural Quick
5121
Structural Rating
7
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
7
Pipe schematic from manhole 05 0012 to 05 0011
MH: 05 0012MH: 05 0011downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 9:19 AM0.1 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 90% MAG24.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - Open40.8 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start92.7 ft. MGP - General Photograph - OUTLINE OF TILES147.9 ft. MGP - General Photograph219.2 ft. MGO - General Observation - Peeling & Flaking Throughout The Reach305.7 ft. MGP - General Photograph414.7 ft. MGP - General Photograph450.4 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 90% MAG450.4 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish450.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish452.7 ft. AMH - Downstream Manhole, Survey Ends - 10:22 AM452.7 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active

Observation photos (8)

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 90% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 90% MAG

  • Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - Open

    24.3 ft. - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - Open

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    40.8 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph - OUTLINE OF TILES

    92.7 ft. - General Photograph - OUTLINE OF TILES

  • General Photograph

    147.9 ft. - General Photograph

  • General Observation - Peeling & Flaking Throughout The Reach

    219.2 ft. - General Observation - Peeling & Flaking Throughout The Reach

  • General Photograph

    305.7 ft. - General Photograph

  • General Photograph

    414.7 ft. - General Photograph

Observations (17)

DistanceCodeObservation
2SSS
0MWL
452.7AMH10:22 AM
0.1MWM
452.7MGOConn. @ Mh, 3 O' Clock. Active
450.4SZ90% MAG
414.7MGP
219.2MGOPeeling & Flaking Throughout The Reach
147.9MGP
305.7MGP
450.4SRV
24.3TFOpen
450.4SSS
40.8SRV
0AMH9:19 AM
92.7MGPOUTLINE OF TILES
2SZ90% MAG

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2018-01-02T08:25:18-08:00
documentation
FRANKLIN, IGNACIO, PARAISO, VENDRYES
is_lateral_inspection
false