Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 28, 2017, 10:52 AM
Date
09/28/2017
W/O
663269
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00659
PipeID
P13622
Time
3:52 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4280
Sewer Name
16 LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
11
Purpose
Routine Assessment
Project
WO_630370_TV05315_AUG2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
22 in.
Width
22 in.
Upstream MH
16 0571
Downstream MH
16 0570
Dir. of Survey
Downstream
Length Surveyed
252 ft.
Total Length
252 ft.
Structural Index
2
Structural Quick
322I
Structural Rating
106
O&M Index
2
O&M Quick
2I00
O&M Rating
100
Overall Index
2
Overall Quick
Overall Rating
206
Pipe schematic from manhole 16 0571 to 16 0570
MH: 16 0571MH: 16 0570downstream0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 05710 ft. MWL - Water Level, 5 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. MGO - General Observation - MAG COAT START2.3 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start2.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start6.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"30.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"59.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"86.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"91.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4" - MOUSE INSIDE THE CONN.106.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4" - TAP ROOTS 15%127.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"158.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4" - 5% FINE ROOTS178.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"215.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"250 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish250 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish250 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish252 ft. MGO - General Observation - MAG COAT FINISH252 ft. AMH - Downstream Manhole, Survey Ends - 16 0570

Observation photos (14)

  • Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"

    6.5 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"

  • Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"

    30.2 ft. - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"

    59.5 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"

    86.1 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"

  • Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4" - MOUSE INSIDE THE CONN.

    91.7 ft. - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4" - MOUSE INSIDE THE CONN.

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4" - TAP ROOTS 15%

    106.5 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4" - TAP ROOTS 15%

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"

    127.3 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4" - 5% FINE ROOTS

    158.6 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4" - 5% FINE ROOTS

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"

    178.6 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"

    215.1 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Finish

    250 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish

  • Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish

    250 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish

Observations (22)

DistanceCodeObservation
59.5TFC
158.6TFC5% FINE ROOTS
250SSS
2SSS
2.3MGOMAG COAT START
0MWM
215.1TFC
250DAGS
6.5TFC
252MGOMAG COAT FINISH
0AMH16 0571
127.3TFC
106.5TFCTAP ROOTS 15%
86.1TFC
252AMH16 0570
0MWL
178.6TFC
91.7TFAMOUSE INSIDE THE CONN.
2.3SAP
30.2TF
250SAP
2.3DAGS

Properties (5)

additional_info
SC352126
custom_field_two
3
customer
LACSD
datetime
2017-09-28T03:52:58-07:00
is_lateral_inspection
false