Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 29, 2017, 08:46 AM
Date
09/29/2017
W/O
663060
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00659
PipeID
P13592
Time
1:46 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4281
Sewer Name
16 LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_630370_TV05315_AUG2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
16 0541
Downstream MH
16 0540
Dir. of Survey
Downstream
Length Surveyed
234.9 ft.
Total Length
234.9 ft.
Structural Index
3
Structural Quick
3H00
Structural Rating
138
O&M Index
2
O&M Quick
2H12
O&M Rating
94
Overall Index
2
Overall Quick
Overall Rating
232
Pipe schematic from manhole 16 0541 to 16 0540
MH: 16 0541MH: 16 0540downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. VC - Vermin Cockroach0 ft. AMH - Upstream Manhole, Survey Begins - 16 05413.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start3.3 ft. MGO - General Observation - MAG COAT START16.3 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 4"24.5 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 4"117.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"122.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"141.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"169.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"173.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"218.1 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 4"223.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"226.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"231 ft. MGO - General Observation - MAG COAT FINISH231 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish231 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish234.9 ft. VC - Vermin Cockroach234.9 ft. AMH - Downstream Manhole, Survey Ends - 16 0540

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.3 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    3.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
16.3TBA
0MWM
231MGOMAG COAT FINISH
24.5TBA
231DAGS
218.1TBA
122.1TFA
117.2TFC
173.8TFC
3.3SAV
226.9TF
3.3DAGS
0MWL
169.7TFC
0VC
234.9VC
231SAV
234.9AMH16 0540
223.3TFC
3.3MGOMAG COAT START
141.8TFA
0AMH16 0541

Properties (5)

additional_info
SC352127
custom_field_two
3
customer
LACSD
datetime
2017-09-29T01:46:14-07:00
is_lateral_inspection
false