Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 22, 2017, 07:06 AM
  • 14 0165_14 0164_09222017_000658.mp4

Date
09/22/2017
W/O
657965
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00584
PipeID
P18203
Time
12:06 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4732
Sewer Name
14 WEST SIDE TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
WO_657965_TV14035_SEP2017
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0165
Downstream MH
14 0164
Dir. of Survey
Downstream
Length Surveyed
438.6 ft.
Total Length
438.6 ft.
Structural Index
3
Structural Quick
3P00
Structural Rating
261
O&M Index
2
O&M Quick
412P
O&M Rating
178
Overall Index
3
Overall Quick
Overall Rating
439
Pipe schematic from manhole 14 0165 to 14 0164
MH: 14 0165MH: 14 0164downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 01650 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - MAG COATING 75%0 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start12.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"15.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"64 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"66.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"112.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"115.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"160.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"170 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"172.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"215.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"263.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"266.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"315.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"318.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"363.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"367.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"415 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"418.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"437 ft. MGO - General Observation - PEELING/FLAKING/SPALLING THROUGHOUT THE REACH438.6 ft. AMH - Downstream Manhole, Survey Ends - 14 0164438.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish438.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (28)

DistanceCodeObservation
0AMH14 0165
115.5TF
363.7TFC
215.3TFC
418.7TFC
315.3TFC
0MWM
415TFC
437MGOPEELING/FLAKING/SPALLING THROUGHOUT THE REACH
438.6AMH14 0164
318.3TFC
66.4TFC
2SAP
160.7TFC
263.8TFC
2DAGS
367.1TFC
64TFC
0MGOMAG COATING 75%
15.3TFC
438.6SAP
170TFC
112.4TFC
12.6TFC
438.6DAGS
266.8TFC
0MWL
172.9TFC

Properties (5)

additional_info
SC345745
custom_field_two
2
customer
LACSD
datetime
2017-09-22T00:06:13-07:00
is_lateral_inspection
false