Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 19, 2017, 11:03 AM
  • 32 1169_32 1168 _19092017_041751.mp4

Date
09/19/2017
W/O
654216
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00839
PipeID
P19623
Time
4:03 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4879
Sewer Name
32 SAN FERNANDO ROAD TRUNK
City
SANTA CLARITA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
WO_630370_TV05315_AUG2017
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1169
Downstream MH
32 1168
Dir. of Survey
Downstream
Length Surveyed
408.3 ft.
Total Length
408.3 ft.
Structural Index
2
Structural Quick
322^
Structural Rating
312
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
2
Overall Quick
Overall Rating
313
Pipe schematic from manhole 32 1169 to 32 1168
MH: 32 1169MH: 32 1168downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 11690 ft. MWM - Water Mark, 15 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start3 ft. MGO - General Observation - MAG COAT39.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"45.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start59.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"96.3 ft. RFJ - Roots Fine Joint, from 07 to 05 o'clock, within 8 inches of joint: YES226.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"231 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"405.6 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish405.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish407 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish408.3 ft. AMH - Downstream Manhole, Survey Ends - 32 1168408.3 ft. MGO - General Observation - LATERAL AT MH 3 OCLOCK

Observation photos (3)

  • Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    45.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Joint, from 07 to 05 o'clock, within 8 inches of joint: YES

    96.3 ft. - Roots Fine Joint, from 07 to 05 o'clock, within 8 inches of joint: YES

Observations (17)

DistanceCodeObservation
0MWL
3SAP
407SSS
3MGOMAG COAT
2SSS
59.7TFC
0AMH32 1169
231TFC
0MWM
405.6SAP
45.8SSS
226.1TF
39.5TFC
96.3RFJ
408.3AMH32 1168
405.6SSS
408.3MGOLATERAL AT MH 3 OCLOCK

Properties (5)

additional_info
SC345939
custom_field_two
3
customer
LACSD
datetime
2017-09-19T04:03:16-07:00
is_lateral_inspection
false