Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 20, 2017, 05:38 AM
  • 32 1163_32 1162_19092017_224401.mp4

Date
09/19/2017
W/O
654216
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00839
PipeID
P19617
Time
10:38 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4881
Sewer Name
32 SAN FERNANDO ROAD TRUNK
City
SANTA CLARITA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
WO_630370_TV05315_AUG2017
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1163
Downstream MH
32 1162
Dir. of Survey
Downstream
Length Surveyed
140.4 ft.
Total Length
140.4 ft.
Structural Index
2
Structural Quick
322D
Structural Rating
60
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
60
Pipe schematic from manhole 32 1163 to 32 1162
MH: 32 1163MH: 32 1162downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 11632 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start139 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish140.4 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish140.4 ft. AMH - Downstream Manhole, Survey Ends - 32 1162

Observation photos (1)

  • Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

Observations (8)

DistanceCodeObservation
140.4SAP
140.4AMH32 1162
2.3SAP
2SSS
139SSS
0MWM
0MWL
0AMH32 1163

Properties (5)

additional_info
SC345941
custom_field_two
2
customer
LACSD
datetime
2017-09-19T22:38:23-07:00
is_lateral_inspection
false