Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 13, 2016, 10:17 AM
  • 02 2264_02 2263 _13102016_032440.mp4

Date
10/13/2016
W/O
592208
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00257
PipeID
P04516
Time
3:17 AM
Certificate
U-507-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3740
Sewer Name
02 DOWNEY-BELLFLOWER RELIEF TRUNK RELOCATION
City
DOWNEY, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
32
Purpose
Routine Assessment
Project
WO_592208_TV02104_SEP2016
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
02 2264
Downstream MH
02 2263
Dir. of Survey
Downstream
Length Surveyed
88.8 ft.
Total Length
88.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2B00
O&M Rating
34
Overall Index
2
Overall Quick
Overall Rating
34
Pipe schematic from manhole 02 2264 to 02 2263
MH: 02 2264MH: 02 2263downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 02 22642 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start88.8 ft. AMH - Downstream Manhole, Survey Ends - 02 226388.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
0MWM
0MWL
2DAGS
88.8AMH02 2263
0MGOCONNECTION AT MH 3 O'CLOCK
88.8DAGS
0AMH02 2264

Properties (6)

additional_info
SC303727
custom_field_two
4
customer
LACSD
datetime
2016-10-13T03:17:23-07:00
documentation
PRO-PIPE
is_lateral_inspection
false