Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 25, 2016, 09:03 AM
  • 14 0177_14 0176_10252016_020335.mp4

Date
10/25/2016
W/O
592016
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00584
PipeID
P18215
Time
2:03 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3792
Sewer Name
14 WEST SIDE TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
18
Purpose
Routine Assessment
Project
WO_592016_TV14035_SEP2016
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0177
Downstream MH
14 0176
Dir. of Survey
Downstream
Length Surveyed
281.5 ft.
Total Length
281.5 ft.
Structural Index
3
Structural Quick
3J2J
Structural Rating
275
O&M Index
2
O&M Quick
2J00
O&M Rating
110
Overall Index
2
Overall Quick
Overall Rating
385
Pipe schematic from manhole 14 0177 to 14 0176
MH: 14 0177MH: 14 0176downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 01770 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start15.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"137.6 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"189.6 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"279.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish279.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish279.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish281.5 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK281.5 ft. MGO - General Observation - COCKROACHES IN MANHOLE281.5 ft. AMH - Downstream Manhole, Survey Ends - 14 0176

Observation photos (4)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    281.5 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (16)

DistanceCodeObservation
3SSS
15.1TFC
281.5MGOACTIVE CONNECTION AT MH 9 O'CLOCK
137.6TBA
0MGOCOCKROACHES IN MANHOLE
279.3DAGS
2SAP
0MWL
0AMH14 0177
189.6TBA
0MWM
281.5MGOCOCKROACHES IN MANHOLE
279.3SAP
279.3SSS
281.5AMH14 0176
3DAGS

Properties (6)

additional_info
SC306330
custom_field_two
2
customer
LACSD
datetime
2016-10-25T02:03:13-07:00
documentation
PRO PIPE
is_lateral_inspection
false