Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 13, 2017, 04:21 PM
  • 30 0118_30 0117_6132017_093320.mp4

Date
06/13/2017
W/O
0635597
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00878
PipeID
P17821
Time
9:21 AM
Certificate
415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7433
Sewer Name
30 SOUTH BAY CITIES MAIN TRUNK
City
REDONDO BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
06
Purpose
Routine Assessment
Project
20170612DF_SOUTH_BAY_CITIES_MAIN_TR
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
30 0117
Downstream MH
30 0118
Dir. of Survey
Upstream
Length Surveyed
445.8 ft.
Total Length
445.8 ft.
Structural Index
3
Structural Quick
3222
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 30 0117 to 30 0118
MH: 30 0117MH: 30 0118upstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. AMH - Upstream Manhole, Survey Ends - 10:11 AM1.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.9 ft. SZC - Surface Other Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 45% MAG COAT1.9 ft. SAPC - Surface Aggregate Projecting Chemical, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish104.8 ft. MGP - General Photograph143.6 ft. MGP - General Photograph205.4 ft. MGP - General Photograph - PEELING/FLAKING237.1 ft. MGP - General Photograph254 ft. CL - Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES335.4 ft. SAPC - Surface Aggregate Projecting Chemical, from 10 to 02 o'clock, within 8 inches of joint: YES, Start369.1 ft. MGP - General Photograph - AGGREGATE/SPALLING/MAG434.6 ft. SZC - Surface Other Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 45% MAG COAT443.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start443.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start445.8 ft. AMH - Downstream Manhole, Survey Begins - 9:23 AM445.8 ft. MWM - Water Mark, 20 %of cross sectional area445.8 ft. MWL - Water Level, 15 %of cross sectional area

Observation photos (10)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 45% MAG COAT

    11.2 ft. - Surface Other Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 45% MAG COAT

  • General Photograph - AGGREGATE/SPALLING/MAG

    76.7 ft. - General Photograph - AGGREGATE/SPALLING/MAG

  • Surface Aggregate Projecting Chemical, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    110.4 ft. - Surface Aggregate Projecting Chemical, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES

    191.8 ft. - Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES

  • General Photograph

    208.7 ft. - General Photograph

  • General Photograph - PEELING/FLAKING

    240.4 ft. - General Photograph - PEELING/FLAKING

  • General Photograph

    302.2 ft. - General Photograph

  • General Photograph

    341 ft. - General Photograph

Observations (19)

DistanceCodeObservation
302.2MGP
0AMH9:23 AM
445.8MGOROACHES @ MH
443.9SAV
341MGP
191.8CL
0MWM
11.2SZC45% MAG COAT
110.4SAPC
208.7MGP
445.8AMH10:11 AM
443.9SSS
443.9SZC45% MAG COAT
2SSS
240.4MGPPEELING/FLAKING
443.9SAPC
76.7MGPAGGREGATE/SPALLING/MAG
0MWL
2SAV

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2017-06-13T09:21:41-07:00
documentation
FRANKLIN, IGNACIO
is_lateral_inspection
false