03 0430_03 0552_6132017_020800.mp4
2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
3 ft. - Surface Reinforcement Corroded, from 08 to 12 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR
8 ft. - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - SLUDGE
8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING ,BLISTERING CONCRETE
8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING ,PEELING CONCRETE
15.5 ft. - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO - SLUDGE
42.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING SWOLLEN CONCRETE
98.3 ft. - Deposits Settled Other, 15 %of cross sectional area, from 06 to 08 o'clock, , within 8 inches of joint: NO - PEELING CONCRETE
144.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE
206.8 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
259.7 ft. - Surface Reinforcement Visible, from 08 to 11 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
320.7 ft. - Surface Reinforcement Visible, from 08 to 12 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR
| Distance | Code | Observation |
|---|---|---|
| 98.3 | DSZ | PEELING CONCRETE |
| 158.3 | ID | — |
| 89.5 | IW | — |
| 8 | DSZ | SLUDGE |
| 198.3 | TF | Open |
| 7.5 | SRC | CIRCUM REBAR |
| 0 | MWM | — |
| 206.8 | SAM | SEVERE AGG |
| 3 | SRC | CIRCUM REBAR |
| 105.3 | IW | — |
| 15.5 | DSZ | SLUDGE |
| 310.8 | IW | — |
| 256.7 | DSZ | SLUDGE |
| 0 | MWL | — |
| 278.4 | IW | — |
| 48.8 | IW | — |
| 328.2 | DSZ | SLUDGE |
| 8 | SSS | PEELING ,BLISTERING CONCRETE |
| 259.7 | SRV | CIRCUM REBAR |
| 42.3 | SSS | PEELING SWOLLEN CONCRETE |
| 79.9 | ID | — |
| 74 | IW | — |
| 239.2 | IW | — |
| 222.7 | ID | — |
| 2 | SAM | SEVERE AGG |
| 8 | SSS | BLISTERING ,PEELING CONCRETE |
| 320.7 | SRV | CIRCUM REBAR |
| 328.7 | AMH | 2:45AM |
| 230.8 | IW | — |
| 328.2 | SAM | SEVERE AGG |
| 144.7 | SSS | PEELING CONCRETE |
| 328.2 | SRV | CIRCUM REBAR |
| 56.8 | ID | — |
| 0 | AMH | 1:55AM |