Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 1, 2016, 07:34 AM
  • 30 0113_30 0112_01062016_003416.mp4

Date
06/01/2016
W/O
574298
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00878
PipeID
P17816
Time
12:34 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3516
Sewer Name
30 SOUTH BAY CITIES MAIN TRUNK
City
REDONDO BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
06
Purpose
Routine Assessment
Project
WO_574298_TV30067_JUNE2016
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Other
Height
18 in.
Upstream MH
30 0113
Downstream MH
30 0112
Dir. of Survey
Downstream
Length Surveyed
217 ft.
Total Length
217.1 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
2
O&M Quick
3A2H
O&M Rating
116
Overall Index
2
Overall Quick
Overall Rating
122
Pipe schematic from manhole 30 0113 to 30 0112
MH: 30 0113MH: 30 0112downstream0 ft. AMH - Upstream Manhole, Survey Begins - 30 01130 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start13.1 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"23.7 ft. CM - Crack Multiple, from 08 to 12 o'clock, within 8 inches of joint: YES151.4 ft. CM - Crack Multiple, from 08 to 12 o'clock, within 8 inches of joint: YES168.6 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start217 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish217 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish217 ft. MSA - Survey Abandoned - DUE TO SETTLED DEPOSITS.

Observation photos (6)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Crack Multiple, from 08 to 12 o'clock, within 8 inches of joint: YES

    23.7 ft. - Crack Multiple, from 08 to 12 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 12 o'clock, within 8 inches of joint: YES

    151.4 ft. - Crack Multiple, from 08 to 12 o'clock, within 8 inches of joint: YES

  • Deposits Settled Other,  15 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    168.6 ft. - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Settled Other,  15 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Finish

    217 ft. - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish

  • Survey Abandoned - DUE TO SETTLED DEPOSITS.

    217 ft. - Survey Abandoned - DUE TO SETTLED DEPOSITS.

Observations (12)

DistanceCodeObservation
23.7CM
2DAGS
217DAGS
151.4CM
0AMH30 0113
217DSZ
217MSADUE TO SETTLED DEPOSITS.
0MGOCOCKROACHES IN MANHOLE
13.1TBA
0MWM
0MWL
168.6DSZ

Properties (6)

additional_info
SC305646
custom_field_two
5
customer
LACSD
datetime
2016-06-01T00:34:08-07:00
documentation
PRO PIPE
is_lateral_inspection
false