Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 25, 2018, 07:25 AM
  • 05 1725_05 1724_4252018_004342.mp4

Date
04/25/2018
W/O
0702963
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00471
PipeID
P06952
Time
12:25 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0840
Sewer Name
05 LOMITA TRUNK
City
LOMITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
32
Purpose
Maintenance Related
Project
20180425MDM_LOMITA_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
05 1725
Downstream MH
05 1724
Dir. of Survey
Downstream
Length Surveyed
231.7 ft.
Total Length
231.7 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
4
Pipe schematic from manhole 05 1725 to 05 1724
MH: 05 1725MH: 05 1724downstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 12:40AM0 ft. MWM - Water Mark, 50 %of cross sectional area60 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Open-TOP OF LATERIAL POSSIBLE ROOTS121.9 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Open-TOP OF LATRIAL-POSSIBLE ROOTS182.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Active-TOP OF LATERIAL-CLEAR231.7 ft. AMH - Downstream Manhole, Survey Ends - 1:05AM

Observation photos (3)

  • Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Open-TOP OF LATERIAL POSSIBLE ROOTS

    60 ft. - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Open-TOP OF LATERIAL POSSIBLE ROOTS

  • Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Open-TOP OF LATRIAL-POSSIBLE ROOTS

    121.9 ft. - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Open-TOP OF LATRIAL-POSSIBLE ROOTS

  • Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Active-TOP OF LATERIAL-CLEAR

    182.6 ft. - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Active-TOP OF LATERIAL-CLEAR

Observations (7)

DistanceCodeObservation
182.6TFActive-TOP OF LATERIAL-CLEAR
231.7AMH1:05AM
0MWL
121.9TFOpen-TOP OF LATRIAL-POSSIBLE ROOTS
0AMH12:40AM
0MWM
60TFOpen-TOP OF LATERIAL POSSIBLE ROOTS

Properties (5)

additional_info
CHIMNEY INSPECTIONS
customer
LACSD
datetime
2018-04-25T00:25:23-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false