Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 23, 2018, 07:53 PM
  • D 0086_D 0085_4232018_130805.mp4

Date
04/23/2018
W/O
0696317
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00155
PipeID
P20087
Time
12:53 PM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0837
Sewer Name
D JOINT OUTFALL D - UNIT 5
City
GARDENA
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
20
Purpose
Routine Assessment
Project
20180423SHO_JOINT_OUTFALL_D_UNIT_5
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Upstream MH
D 0085
Downstream MH
D 0086
Dir. of Survey
Upstream
Length Surveyed
2 ft.
Total Length
2 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
7
Pipe schematic from manhole D 0085 to D 0086
MH: D 0085MH: D 0086upstream0 ft. MSA - Survey Abandoned - UPLEG OF THE EAST BARREL0 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES2 ft. MWM - Water Mark, 55 %of cross sectional area2 ft. MGO - General Observation - LINE IS ACTUALLY RCP-CTL2 ft. AMH - Downstream Manhole, Survey Begins - 01052 ft. MWL - Water Level, 40 %of cross sectional area

Observation photos (2)

  • General Observation - LINE IS ACTUALLY RCP-CTL

    0 ft. - General Observation - LINE IS ACTUALLY RCP-CTL

  • Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES

Observations (6)

DistanceCodeObservation
0MWM
0MGOLINE IS ACTUALLY RCP-CTL
0AMH0105
2MSAUPLEG OF THE EAST BARREL
0MWL
2SAP

Properties (7)

additional_info
VIEW OF THE UPLEG OF THE EAST BARREL
custom_field_three
SAP
custom_field_two
1
customer
LACSD
datetime
2018-04-23T12:53:24-07:00
documentation
OBREGON, BRAR, VENDRYES, PARAISO
is_lateral_inspection
false