Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 23, 2018, 05:56 PM
  • 29 0322_29 0321_4232018_115756.mp4

Date
04/23/2018
W/O
0701216
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z01024
PipeID
P24339
Time
10:56 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7690
Sewer Name
29 PACIFIC COAST HIGHWAY TRUNK
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Capital Improvement Program Assesment
Project
20180423DF_PACIFIC_COAST_HIGHWAY_TRUNK
Material
NRCP
Shape
Circular
Height
8 in.
Upstream MH
29 0322
Downstream MH
29 0321
Dir. of Survey
Downstream
Length Surveyed
330 ft.
Total Length
330 ft.
Structural Index
3
Structural Quick
3424
Structural Rating
20
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
20
Pipe schematic from manhole 29 0322 to 29 0321
MH: 29 0322MH: 29 0321downstream0 ft. AMH - Upstream Manhole, Survey Begins - 11:02 AM0.1 ft. MWM - Water Mark, 10 %of cross sectional area0.1 ft. MGO - General Observation - ROACHES @ MH0.1 ft. MWL - Water Level, 5 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start99.8 ft. MGP - General Photograph119.7 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open128.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES193.2 ft. FL - Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES200.9 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES209.4 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 4"234.2 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES252.1 ft. MGP - General Photograph282.9 ft. CL - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES291.6 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 4"310.8 ft. MGP - General Photograph310.8 ft. MMC - Material Change, Vitrified clay pipe314.3 ft. MMC - Material Change, Concrete pipe (non-reinfored)314.3 ft. MGP - General Photograph326.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish326.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish326.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish329.1 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active329.1 ft. MGO - General Observation - ROACHES @ MH330 ft. AMH - Downstream Manhole, Survey Ends - 12:32 PM

Observation photos (13)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    99.8 ft. - General Photograph

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    128.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES

    193.2 ft. - Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    200.9 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    234.2 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • General Photograph

    252.1 ft. - General Photograph

  • Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

    282.9 ft. - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

  • General Photograph

    310.8 ft. - General Photograph

  • Material Change, Vitrified clay pipe

    310.8 ft. - Material Change, Vitrified clay pipe

  • Material Change, Concrete pipe (non-reinfored)

    314.3 ft. - Material Change, Concrete pipe (non-reinfored)

  • General Photograph

    314.3 ft. - General Photograph

Observations (28)

DistanceCodeObservation
99.8MGP
209.4TFA
0.1MWM
310.8MGP
2SSS
0AMH11:02 AM
193.2FL
326.7SAV
314.3MMC
282.9CL
314.3MGP
2MGOConn. @ Mh, 3 O' Clock. Active
329.1MGOConn. @ Mh, 3 O' Clock. Active
310.8MMC
326.7SSS
330AMH12:32 PM
252.1MGP
128.8CM
0.1MGOROACHES @ MH
326.7CM
119.7TFOpen
329.1MGOROACHES @ MH
0.1MWL
291.6TFA
2CM
2SAV
200.9CL
234.2CL

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2018-04-23T10:56:28-07:00
documentation
FRANKLIN, IGNACIO, SHADLER
is_lateral_inspection
false