Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 20, 2018, 04:25 PM
  • Section#3_03 0212_03 0211__4202018__G6989.mp4

Date
04/20/2018
W/O
0672783
Weather
Light Rain
Operator/Surveyor
FRANKLIN
Sewer ID
Z00387
PipeID
P04812
Time
9:25 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6989
Sewer Name
03 NORTH LONG BEACH TRUNK
City
LONG BEACH
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
10
Purpose
Routine Assessment
Project
20180419DF_NORTH_LONG_BEACH_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
30 in.
Upstream MH
03 0212
Downstream MH
03 0211
Dir. of Survey
Downstream
Length Surveyed
380.9 ft.
Total Length
380.9 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
383
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
385
Pipe schematic from manhole 03 0212 to 03 0211
MH: 03 0212MH: 03 0211downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 10:39 AM0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES43.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES75.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 4" - OPEN235.8 ft. MGP - General Photograph343.1 ft. MGP - General Photograph380.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish380.9 ft. AMH - Downstream Manhole, Survey Ends - 11:29 AM/ZOOMED D/S MH380.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (6)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    4.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    43.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • General Photograph

    235.8 ft. - General Photograph

  • General Photograph

    343.1 ft. - General Photograph

Observations (13)

DistanceCodeObservation
0MWL
343.1MGP
75.8TFOPEN
380.9SSS
380.9AMH11:29 AM/ZOOMED D/S MH
0AMH10:39 AM
43.2CM
4.4DAGS
2CM
0MWM
380.9CM
235.8MGP
2SSS

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2018-04-20T09:25:16-07:00
documentation
FRANKLIN, IGNACIO, PARAISO
is_lateral_inspection
false