Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 28, 2017, 06:38 AM
  • 22 0232_22 0231 _27112017_230226.mp4

Date
11/27/2017
W/O
674548
Weather
Dry
Operator/Surveyor
ERUIZ
Sewer ID
Z00793
PipeID
P16513
Time
10:38 PM
Certificate
123456
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5143
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
WO_674584_TV22017_DEC2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
22 0232
Downstream MH
22 0231
Dir. of Survey
Downstream
Length Surveyed
388 ft.
Total Length
388 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 22 0232 to 22 0231
MH: 22 0232MH: 22 0231downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 02320 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area7.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start7.2 ft. MGO - General Observation - MAGNESIUM COATING START27.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"39.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"75.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"88.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"135.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"148.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"184.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"196.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"232.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"245.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"266.3 ft. CL - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES281.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"293.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"297.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"306 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"341.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"354 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"385.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish388 ft. AMH - Downstream Manhole, Survey Ends - 22 0231

Observation photos (2)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    7.2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

    266.3 ft. - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

Observations (24)

DistanceCodeObservation
245.2TFC
148.1TFA
88.1TFC
281.9TF
7.2SAP
39.6TFA
135.7TF
306TFC
0AMH22 0232
297.8TFA
196.6TFA
354TFA
293.2TFC
27.1TFC
184.1TFC
385.1SAP
266.3CL
388AMH22 0231
341.3TFC
232.4TF
75.8TF
0MWL
0MWM
7.2MGOMAGNESIUM COATING START

Properties (6)

additional_info
SC346453
custom_field_two
3
customer
LACSD
datetime
2017-11-27T22:38:29-08:00
documentation
PROPIPE
is_lateral_inspection
false