Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 26, 2017, 08:21 AM
  • H 1497_H 1496 _261017_002057.mp4

Date
10/26/2017
W/O
668649
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01206
PipeID
P16457
Time
1:21 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5038
Sewer Name
H JOINT OUTFALL H - UNIT 8M RELIEF
City
WEST COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
30
Purpose
Routine Assessment
Project
WO_668649_TV22094_NOV2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
H 1497
Downstream MH
H 1496
Dir. of Survey
Downstream
Length Surveyed
623.8 ft.
Total Length
623.8 ft.
Structural Index
3
Structural Quick
513X
Structural Rating
625
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
625
Pipe schematic from manhole H 1497 to H 1496
MH: H 1497MH: H 1496downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 14970 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 25 %of cross sectional area4.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start62.6 ft. SRV - Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: NO130.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"623.8 ft. AMH - Downstream Manhole, Survey Ends - H 1496623.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish623.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish623.8 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK623.8 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: NO

    62.6 ft. - Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: NO

Observations (13)

DistanceCodeObservation
0AMHH 1497
623.8AMHH 1496
62.6SRV
4.6SSS
0MWL
623.8SSS
623.8SAP
0MGOCONNECTION AT MH 9 O'CLOCK
0MWM
623.8MGOCONNECTION AT MH 3 O'CLOCK
130.8TFC
4.6SAP
623.8MGOCONNECTION AT MH 9 O'CLOCK

Properties (6)

additional_info
SC346261
custom_field_two
3
customer
LACSD
datetime
2017-10-26T01:21:12-07:00
documentation
PROPIPE
is_lateral_inspection
false