Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 9, 2017, 05:59 AM
  • H 1480_H 1479 _081117_222628.mpg

Date
11/08/2017
W/O
668649
Weather
Dry
Operator/Surveyor
ERUIZ
Sewer ID
Z01206
PipeID
P16440
Time
9:59 PM
Certificate
123456
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5133
Sewer Name
H JOINT OUTFALL H - UNIT 8M RELIEF
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
WO_668649_TV22094_NOV2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Width
39 in.
Upstream MH
H 1480
Downstream MH
H 1479
Dir. of Survey
Downstream
Length Surveyed
530.8 ft.
Total Length
530.8 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole H 1480 to H 1479
MH: H 1480MH: H 1479downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 14807 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start7 ft. MGO - General Observation - MAGNEZIUM H.O COATING start53.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"107.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"201.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"249.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"355.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"402.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"457.4 ft. LR - Alignment Right, 15 %526.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish530.8 ft. AMH - Downstream Manhole, Survey Ends - H 1479

Observation photos (1)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    7 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
53.8TFA
7SAP
402.9TFA
457.4LR
249.3TFA
526.9SAP
0MWM
107.9TFA
0MWL
7MGOMAGNEZIUM H.O COATING start
355.8TFA
201.4TFA
0AMHH 1480
530.8AMHH 1479

Properties (7)

additional_info
SC348341
custom_field_two
3
customer
LACSD
datetime
2017-11-08T21:59:37-08:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
27198