Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 3, 2017, 11:00 AM
  • 05 1142_05 1141 _11032017_040128.mp4

Date
11/03/2017
W/O
668623
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00436
PipeID
P06381
Time
4:00 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5208
Sewer Name
05 EAST ROSECRANS AVENUE TRUNK, SECTION 1
City
GARDENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
18
Purpose
Routine Assessment
Project
WO_668623_TV05022_NOV2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
05 1142
Downstream MH
05 1141
Dir. of Survey
Downstream
Length Surveyed
342.6 ft.
Total Length
342.6 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
412T
O&M Rating
210
Overall Index
2
Overall Quick
Overall Rating
210
Pipe schematic from manhole 05 1142 to 05 1141
MH: 05 1142MH: 05 1141downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 11420 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start11.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"55.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"107.6 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"160 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"165.3 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS229 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"242.8 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"325.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"340.5 ft. MGO - General Observation - COCKROACHES IN MANHOLE340.5 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish340.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish342.6 ft. AMH - Downstream Manhole, Survey Ends - 05 1141

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - DEBRIS

    165.3 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS

Observations (17)

DistanceCodeObservation
229TFC
2DAGS
242.8TBA
340.5MGOCOCKROACHES IN MANHOLE
340.5DSZ
11.1TFC
342.6AMH05 1141
165.3DSZDEBRIS
55.9TFC
0AMH05 1142
340.5DAGS
107.6TFC
325.7TFC
160TFC
0MGOCOCKROACHES IN MANHOLE
0MWL
0MWM

Properties (6)

additional_info
SC346078
custom_field_two
4
customer
LACSD
datetime
2017-11-03T04:00:42-07:00
documentation
PRO PIPE
is_lateral_inspection
false