Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 4, 2017, 09:10 AM
  • 20 0255_20 0254_10042017_021035.mp4

Date
10/04/2017
W/O
663234
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00753
PipeID
P19222
Time
2:10 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4740
Sewer Name
20 35TH STREET EAST TRUNK
City
PALMDALE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
13
Purpose
Routine Assessment
Project
WO_663234_TV20009_OCT2017
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0255
Downstream MH
20 0254
Dir. of Survey
Downstream
Length Surveyed
378.2 ft.
Total Length
378.2 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
375
O&M Index
2
O&M Quick
2N00
O&M Rating
150
Overall Index
2
Overall Quick
Overall Rating
525
Pipe schematic from manhole 20 0255 to 20 0254
MH: 20 0255MH: 20 0254downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 02552 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start10.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"58.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"110.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"158.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"210 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"309.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"358 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"376.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish376.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish376.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish378.2 ft. AMH - Downstream Manhole, Survey Ends - 20 0254

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
210TFC
376.5SSS
376.5SAP
2DAGS
378.2AMH20 0254
376.5DAGS
158.3TFC
110.8TFC
2SSS
0MWM
10.9TFC
0MWL
309.8TFC
2SAP
58.9TFC
0AMH20 0255
358TFC

Properties (6)

additional_info
SC346054
custom_field_two
2
customer
LACSD
datetime
2017-10-04T02:10:08-07:00
documentation
PRO PIPE
is_lateral_inspection
false