Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 15, 2018, 10:39 AM
  • A 0176_A 0175_15022018_035255.mp4

Date
02/15/2018
W/O
685104
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00323
PipeID
P08113
Time
2:39 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5457
Sewer Name
A JOA-1A LOS COYOTES WRP INTERCEPTOR
City
BELLFLOWER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
32
Purpose
Routine Assessment
Project
WO_685104_TV30023_FEB2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
78 in.
Width
78 in.
Upstream MH
A 0176
Downstream MH
A 0175
Dir. of Survey
Downstream
Length Surveyed
508.8 ft.
Total Length
508.8 ft.
Structural Index
3
Structural Quick
513S
Structural Rating
308
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
308
Pipe schematic from manhole A 0176 to A 0175
MH: A 0176MH: A 0175downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - A 01760 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - MAG COATING THROUGHOUT 40%2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start508.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish508.8 ft. AMH - Downstream Manhole, Survey Ends - A 0175

Observation photos (2)

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (8)

DistanceCodeObservation
0MWM
0AMHA 0176
2SRV
0MWL
0MGOMAG COATING THROUGHOUT 40%
508.8SAP
508.8AMHA 0175
2SAP

Properties (7)

additional_info
SC346991
custom_field_two
3
customer
LACSD
datetime
2018-02-15T02:39:40-08:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
28048