Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 3, 2016, 10:45 AM
  • 20 0413_20 0412 _11032016_034738.mp4

Date
11/03/2016
W/O
602271
Weather
Dry
Operator/Surveyor
S LOPEZ
Sewer ID
Z00746
PipeID
P19362
Time
3:45 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3906
Sewer Name
20 5TH STREET EAST TRUNK
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
12
Purpose
Routine Assessment
Project
WO_602271_TV20015_NOV2016
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
20 0413
Downstream MH
20 0412
Dir. of Survey
Downstream
Length Surveyed
299.4 ft.
Total Length
299.4 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 20 0413 to 20 0412
MH: 20 0413MH: 20 0412downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 041310.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"27.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"75.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"106.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"125.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"176.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"187.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"228 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"275.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"289.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"299.4 ft. AMH - Downstream Manhole, Survey Ends - 20 0412

Observations (14)

DistanceCodeObservation
0MWL
75.3TFC
275.1TFC
27.8TFC
0MWM
125.9TFC
299.4AMH20 0412
0AMH20 0413
176.5TFC
187.1TF
106.3TF
289.1TFA
228TFC
10.9TFA

Properties (6)

additional_info
SC306344
custom_field_two
4
customer
LACSD
datetime
2016-11-03T03:45:18-07:00
documentation
PRO PIPE
is_lateral_inspection
false