Wastewater/Activity/PacpInspection/1.0Nov 4, 2015, 01:05 PM
  • 20 0141_20 0140_04112015_050602.mp4

Date
11/04/2015
W/O
532892
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00745
PipeID
P19064
Time
5:05 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K2821
Sewer Name
20 TRUNK "D"
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
06
Purpose
Routine Assessment
Project
WO_532892_TV20029_OCT2015
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
12 in.
Upstream MH
20 0141
Downstream MH
20 0140
Dir. of Survey
Downstream
Length Surveyed
194.9 ft.
Total Length
194.9 ft.
Structural Index
3
Structural Quick
3G2F
Structural Rating
182
O&M Index
2
O&M Quick
2G00
O&M Rating
76
Overall Index
2
Overall Quick
Overall Rating
258
Pipe schematic from manhole 20 0141 to 20 0140
MH: 20 0141MH: 20 0140downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 01410 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start9.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"21.3 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start37.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"62 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"85.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"110 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"137.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"161.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"185.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"189 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish192.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish192.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish194.9 ft. AMH - Downstream Manhole, Survey Ends - 20 0140

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    21.3 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
37.9TFC
161.7TFC
194.9AMH20 0140
2DAGS
21.3SSS
192.8DAGS
85.7TFC
192.8SAP
110TFC
9.6TFC
0MWM
137.6TFC
189SSS
0AMH20 0141
62TFC
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
2SAP
185.8TFC
0MWL

Properties (6)

additional_info
SC204155
custom_field_two
2
customer
LACSD
datetime
2015-11-04T05:05:17-08:00
documentation
PRO PIPE
is_lateral_inspection