Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 4, 2015, 11:16 AM
  • 20 0153_20 0152_04112015_031707.mp4

Date
11/04/2015
W/O
532892
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00745
PipeID
P19076
Time
3:16 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K2821
Sewer Name
20 TRUNK "D"
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
06
Purpose
Routine Assessment
Project
WO_532892_TV20029_OCT2015
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
10 in.
Upstream MH
20 0153
Downstream MH
20 0152
Dir. of Survey
Downstream
Length Surveyed
298.3 ft.
Total Length
298.3 ft.
Structural Index
3
Structural Quick
3K00
Structural Rating
177
O&M Index
2
O&M Quick
412K
O&M Rating
124
Overall Index
3
Overall Quick
Overall Rating
301
Pipe schematic from manhole 20 0153 to 20 0152
MH: 20 0153MH: 20 0152downstream0 ft. AMH - Upstream Manhole, Survey Begins - 20 01530 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start25.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"53.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"77.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"105.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"129.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"152.1 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 12 to 03 o'clock, , within 8 inches of joint: YES153.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"177.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"201.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"229.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"253.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"277.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"296.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish296.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish298.3 ft. AMH - Downstream Manhole, Survey Ends - 20 0152

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
53.3TFC
129.5TFC
25.2TFC
153.4TFC
152.1DAGS
0AMH20 0153
2SAP
0MWL
177.3TFC
105.4TFC
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
253.7TFC
229.4TFC
2DAGS
0MWM
298.3AMH20 0152
77.5TFC
296.6DAGS
201.5TFC
296.6SAP
277.8TFC

Properties (6)

additional_info
SC204155
custom_field_two
3
customer
LACSD
datetime
2015-11-04T03:16:49-08:00
documentation
PRO PIPE
is_lateral_inspection
false