Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 5, 2015, 06:39 AM
  • 20 0146_20 0145_04112015_223934.mp4

Date
11/04/2015
W/O
532892
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00745
PipeID
P19069
Time
10:39 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K2822
Sewer Name
20 TRUNK "D"
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
06
Purpose
Routine Assessment
Project
WO_532892_TV20029_OCT2015
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
12 in.
Upstream MH
20 0146
Downstream MH
20 0145
Dir. of Survey
Downstream
Length Surveyed
397.4 ft.
Total Length
397.4 ft.
Structural Index
3
Structural Quick
3O00
Structural Rating
237
O&M Index
2
O&M Quick
2P00
O&M Rating
168
Overall Index
2
Overall Quick
Overall Rating
405
Pipe schematic from manhole 20 0146 to 20 0145
MH: 20 0146MH: 20 0145downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 01462 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start63.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"95.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"124 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"151.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"183.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"244 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"304 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"349.2 ft. MWL - Water Level, 40 %of cross sectional area360.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"368.4 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start395.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish395.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish395.5 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish397.4 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK397.4 ft. AMH - Downstream Manhole, Survey Ends - 20 0145

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
397.4MGOACTIVE CONNECTION AT MH 3 O'CLOCK
395.5DAGS
244TFC
183.9TFC
360.3TFC
395.5SAP
151.8TFC
2DAGS
397.4AMH20 0145
0MWM
0MWL
0AMH20 0146
63.5TFC
395.5DSZ
304TFC
368.4DSZ
349.2MWL
95.6TFC
2SAP
124TFC

Properties (6)

additional_info
SC204156
custom_field_two
3
customer
LACSD
datetime
2015-11-04T22:39:17-08:00
documentation
PRO PIPE
is_lateral_inspection
false