Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 4, 2015, 09:04 AM
  • 20 0150_20 0149_04112015_010506.mp4

Date
11/04/2015
W/O
532892
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00745
PipeID
P19073
Time
1:04 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K2821
Sewer Name
20 TRUNK "D"
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
06
Purpose
Routine Assessment
Project
WO_532892_TV20029_OCT2015
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
10 in.
Upstream MH
20 0150
Downstream MH
20 0149
Dir. of Survey
Downstream
Length Surveyed
307.6 ft.
Total Length
307.6 ft.
Structural Index
3
Structural Quick
3K00
Structural Rating
183
O&M Index
2
O&M Quick
412K
O&M Rating
126
Overall Index
3
Overall Quick
Overall Rating
309
Pipe schematic from manhole 20 0150 to 20 0149
MH: 20 0150MH: 20 0149downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 01500 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start9.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"33.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"57.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"85.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"109.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"132.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"160.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"184.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"208.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"231.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"255.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"283 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"305.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish305.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish307.6 ft. AMH - Downstream Manhole, Survey Ends - 20 0149

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
160.5TFC
208.2TFC
0MWL
0AMH20 0150
109.1TFC
33.5TFC
184.1TFC
0MWM
2SAP
9.4TFC
2DAGS
307.6AMH20 0149
132.4TFC
283TFC
305.8DAGS
305.8SAP
255.6TFC
231.6TFC
57.3TFC
85.3TFC

Properties (6)

additional_info
SC204155
custom_field_two
3
customer
LACSD
datetime
2015-11-04T01:04:47-08:00
documentation
PRO PIPE
is_lateral_inspection
false