Wastewater/Activity/PacpInspection/1.0Nov 4, 2015, 07:02 AM
  • 20 0156_20 0155_03112015_230319.mp4

Date
11/03/2015
W/O
532892
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00745
PipeID
P19079
Time
11:02 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K2821
Sewer Name
20 TRUNK "D"
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
06
Purpose
Routine Assessment
Project
WO_532892_TV20029_OCT2015
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
10 in.
Upstream MH
20 0156
Downstream MH
20 0155
Dir. of Survey
Downstream
Length Surveyed
329.8 ft.
Total Length
329.8 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
195
O&M Index
2
O&M Quick
2L00
O&M Rating
130
Overall Index
3
Overall Quick
Overall Rating
325
Pipe schematic from manhole 20 0156 to 20 0155
MH: 20 0156MH: 20 0155downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 01562 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start24 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"29.3 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: NO, 6"50.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"75.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"99.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"123.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"146.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"170.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"198 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"222.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"245.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"269.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"279.2 ft. MWL - Water Level, 50 %of cross sectional area296.9 ft. MWL - Water Level, 20 %of cross sectional area297 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"316.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"327.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish327.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish329.8 ft. AMH - Downstream Manhole, Survey Ends - 20 0155

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (24)

DistanceCodeObservation
2SAP
269.5TFC
24TFC
316.6TFC
296.9MWL
75.2TFC
327.4SAP
0MWL
279.2MWL
245.4TFC
170.6TFC
146.8TFC
327.4DAGS
222.2TFC
50.5TFC
0MWM
123.1TFC
297TFC
0AMH20 0156
198TFC
99.1TFC
329.8AMH20 0155
2DAGS
29.3TBA

Properties (6)

additional_info
SC204155
custom_field_two
3
customer
LACSD
datetime
2015-11-03T23:02:30-08:00
documentation
PRO PIPE
is_lateral_inspection
false