Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 4, 2015, 07:35 AM
  • 20 0160_20 0159_03112015_233835.mp4

Date
11/03/2015
W/O
532892
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00745
PipeID
P19083
Time
11:35 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K2821
Sewer Name
20 TRUNK "D"
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
06
Purpose
Routine Assessment
Project
WO_532892_TV20029_OCT2015
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
10 in.
Upstream MH
20 0159
Downstream MH
20 0160
Dir. of Survey
Upstream
Length Surveyed
320.6 ft.
Total Length
320.6 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
189
O&M Index
2
O&M Quick
2211
O&M Rating
5
Overall Index
3
Overall Quick
Overall Rating
194
Pipe schematic from manhole 20 0159 to 20 0160
MH: 20 0159MH: 20 0160upstream0 ft. AMH - Upstream Manhole, Survey Ends - 20 01600 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK1.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish1.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish26.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"50.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"73.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"101.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"125 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"148.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"175.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"199.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"206 ft. RFJ - Roots Fine Joint, at 03 o'clock, within 8 inches of joint: YESR221.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"248.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"272.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"278.1 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"296.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"318.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start318.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start320.6 ft. MWM - Water Mark, 25 %of cross sectional area320.6 ft. AMH - Downstream Manhole, Survey Begins - 20 0159320.6 ft. MWL - Water Level, 15 %of cross sectional area

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Joint, at 03 o'clock, within 8 inches of joint: YESR

    114.6 ft. - Roots Fine Joint, at 03 o'clock, within 8 inches of joint: YESR

Observations (24)

DistanceCodeObservation
172.3TFC
293.9TFC
318.8DAGS
2DAGS
195.6TFC
121.5TFC
320.6AMH20 0160
318.8SAP
219.5TFC
247TFC
144.7TFC
0MWM
320.6MGOACTIVE CONNECTION AT MH 3 O'CLOCK
270.4TFC
42.5TBA
47.8TFA
98.7TFC
0AMH20 0159
0MWL
71.9TFC
114.6RFJ
2SAP
24.4TFC
320.6MGOACTIVE CONNECTION AT MH 9 O'CLOCK

Properties (6)

additional_info
SC204155
custom_field_two
3
customer
LACSD
datetime
2015-11-03T23:35:07-08:00
documentation
PRO PIPE
is_lateral_inspection
false