Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 4, 2015, 07:52 AM
  • 20 0161_20 0160_03112015_235255.mp4

Date
11/03/2015
W/O
532892
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00745
PipeID
P19084
Time
11:52 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K2821
Sewer Name
20 TRUNK "D"
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
06
Purpose
Routine Assessment
Project
WO_532892_TV20029_OCT2015
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
10 in.
Upstream MH
20 0160
Downstream MH
20 0161
Dir. of Survey
Upstream
Length Surveyed
348.1 ft.
Total Length
348.1 ft.
Structural Index
3
Structural Quick
3M00
Structural Rating
207
O&M Index
2
O&M Quick
2M00
O&M Rating
138
Overall Index
3
Overall Quick
Overall Rating
345
Pipe schematic from manhole 20 0160 to 20 0161
MH: 20 0160MH: 20 0161upstream0 ft. AMH - Upstream Manhole, Survey Ends - 20 01610 ft. MGO - General Observation - STUB CONNECTION AT MH 9 O'CLOCK1.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish1.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish53.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"100.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"148.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"200 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6+"251.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"303.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"327.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"346.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start346.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start348.1 ft. MWM - Water Mark, 25 %of cross sectional area348.1 ft. MWL - Water Level, 15 %of cross sectional area348.1 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK348.1 ft. AMH - Downstream Manhole, Survey Begins - 20 0160348.1 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
0MWM
0MWL
2SAP
148.1TFC
346.7DAGS
44.8TFC
199.7TFC
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
348.1AMH20 0161
96.7TFC
0AMH20 0160
295TFC
247.4TFC
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
20.9TFC
348.1MGOSTUB CONNECTION AT MH 9 O'CLOCK
2DAGS
346.7SAP

Properties (6)

additional_info
SC204155
custom_field_two
3
customer
LACSD
datetime
2015-11-03T23:52:39-08:00
documentation
PRO PIPE
is_lateral_inspection
false