Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 3, 2015, 12:04 PM
  • 20 0254_20 0253_03112015_040427.mp4

Date
11/03/2015
W/O
531056
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00753
PipeID
P19221
Time
4:04 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K2820
Sewer Name
20 35TH STREET EAST TRUNK
City
PALMDALE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
07
Purpose
Routine Assessment
Project
WO_531056_TV20009_OCT2015
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
20 0254
Downstream MH
20 0253
Dir. of Survey
Downstream
Length Surveyed
380.7 ft.
Total Length
380.7 ft.
Structural Index
3
Structural Quick
3N00
Structural Rating
228
O&M Index
2
O&M Quick
412N
O&M Rating
156
Overall Index
3
Overall Quick
Overall Rating
384
Pipe schematic from manhole 20 0254 to 20 0253
MH: 20 0254MH: 20 0253downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 02542 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start28.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"84.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"85.8 ft. MGO - General Observation - MAG COATING 80%132.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"181.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"233.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"281.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"300.8 ft. MGO - General Observation - RUN LIST STATES MH AT 300'.329.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"380.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish380.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish380.7 ft. AMH - Downstream Manhole, Survey Ends - 20 0253

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
181.1TFC
281.6TFC
0MWM
0MWL
380.7DAGS
132.6TFC
85.8MGOMAG COATING 80%
0AMH20 0254
329.5TFC
84.1TFC
380.7SAP
380.7AMH20 0253
3SAP
300.8MGORUN LIST STATES MH AT 300'.
28.2TFC
2DAGS
233.3TFC

Properties (6)

additional_info
SC204154
custom_field_two
3
customer
LACSD
datetime
2015-11-03T04:04:09-08:00
documentation
PRO PIPE
is_lateral_inspection
false