Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 3, 2015, 09:29 AM
  • 20 0266_20 0265_03112015_012953.mp4

Date
11/03/2015
W/O
521056
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00753
PipeID
P19233
Time
1:29 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K2820
Sewer Name
20 35TH STREET EAST TRUNK
City
PALMDALE
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
07
Purpose
Routine Assessment
Project
WO_531056_TV20009_OCT2015
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
10 in.
Upstream MH
20 0265
Downstream MH
20 0266
Dir. of Survey
Upstream
Length Surveyed
357.5 ft.
Total Length
357.5 ft.
Structural Index
3
Structural Quick
3M00
Structural Rating
213
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
217
Pipe schematic from manhole 20 0265 to 20 0266
MH: 20 0265MH: 20 0266upstream0 ft. AMH - Upstream Manhole, Survey Ends - 20 02660.2 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK1.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish18 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"69.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"118 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"166.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"218.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"266.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"317.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"355.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start357.5 ft. MWL - Water Level, 30 %of cross sectional area357.5 ft. AMH - Downstream Manhole, Survey Begins - 20 0265357.5 ft. MWM - Water Mark, 50 %of cross sectional area

Observation photos (1)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
91.1TFA
191.1TFC
239.5TFC
357.5AMH20 0266
357.3MGOACTIVE CONNECTION AT MH 9 O'CLOCK
0MWL
39.7TFC
356SAP
0AMH20 0265
139.1TFC
0MWM
339.5TFC
287.6TFC
2.3SAP

Properties (6)

additional_info
SC204154
custom_field_two
3
customer
LACSD
datetime
2015-11-03T01:29:34-08:00
documentation
PRO PIPE
is_lateral_inspection
false