Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 17, 2017, 10:42 AM
  • 29 0268A_29 0268 _17032017_034213.mpg

Date
03/17/2017
W/O
624460
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00550
PipeID
P24174
Time
3:42 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4383
Sewer Name
29 WEST HILL STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Routine Assessment
Project
WO_624460_TV29035_MAR2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0268
Downstream MH
29 0268A
Dir. of Survey
Upstream
Length Surveyed
225 ft.
Total Length
225 ft.
Structural Index
3
Structural Quick
4133
Structural Rating
16
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
16
Pipe schematic from manhole 29 0268 to 29 0268A
MH: 29 0268MH: 29 0268Aupstream0 ft. AEP - End of Pipe - 29 0268A2.9 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"10.3 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6"43.6 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 6"52.1 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"66.4 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6"84.8 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"102.3 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"104.9 ft. CL - Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES144.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"146.8 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"155.4 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"191.1 ft. JOM - Joint Offset Medium202.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish218.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start221.9 ft. FM - Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES225 ft. AMH - Downstream Manhole, Survey Begins - 29 0268225 ft. MWM - Water Mark, 5 %of cross sectional area225 ft. MWL - Water Level, 5 %of cross sectional area

Observation photos (5)

  • Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES

    3.1 ft. - Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Joint Offset Medium

    33.9 ft. - Joint Offset Medium

  • Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES

    120.1 ft. - Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES

  • Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6"

    158.6 ft. - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6"

Observations (19)

DistanceCodeObservation
158.6TB
222.1TFC
6.9CM
78.2TFC
0AMH29 0268
0MWM
140.2TFC
80.8TFC
33.9JOM
69.6TFA
0MWL
122.7TFC
181.4TF
120.1CL
214.7TF
22.3CM
172.9TFC
3.1FM
225AEP29 0268A

Properties (6)

additional_info
SC306892
custom_field_two
3
customer
LACSD
datetime
2017-03-17T03:42:03-07:00
documentation
PROPIPE
is_lateral_inspection
false