Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 26, 2018, 04:41 PM
  • A 0847_A 0846_11262018_113659.mp4

Date
11/26/2018
W/O
PENDING
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00324
PipeID
P08187
Time
8:41 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7862
Sewer Name
A JOA-1A NORTH LONG BEACH INTERCEPTOR
City
LAKEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
08
Purpose
Capital Improvement Program Assesment
Project
20181126DF_JOA_1A_NORTH_LONG_BEACH_INT
Material
Vitrified Clay Pipe
Shape
Circular
Height
33 in.
Upstream MH
A 0847
Downstream MH
A 0846
Dir. of Survey
Downstream
Length Surveyed
745.3 ft.
Total Length
745.3 ft.
Structural Index
3
Structural Quick
4134
Structural Rating
28
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
30
Pipe schematic from manhole A 0847 to A 0846
MH: A 0847MH: A 0846downstream0 ft. AMH - Upstream Manhole, Survey Begins - 9:31 AM0.1 ft. MWM - Water Mark, 35 %of cross sectional area0.1 ft. MWL - Water Level, 30 %of cross sectional area2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start27.8 ft. MGP - General Photograph34.3 ft. MGP - General Photograph42.1 ft. MGP - General Photograph51.2 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES57.2 ft. CM - Crack Multiple, from 10 to 12 o'clock, within 8 inches of joint: YES104.7 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES300.1 ft. MGP - General Photograph411.9 ft. MGP - General Photograph448.5 ft. MGP - General Photograph448.5 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES489.3 ft. MGP - General Photograph493.4 ft. MGP - General Photograph493.4 ft. MMC - Material Change, Concrete pipe (non-reinfored) - START495.2 ft. MMC - Material Change, Concrete pipe (non-reinfored) - END537 ft. CS - Crack Spiral, from 01 to 02 o'clock, within 8 inches of joint: YES, Start542.4 ft. CS - Crack Spiral, from 01 to 02 o'clock, within 8 inches of joint: YES, Finish542.4 ft. CS - Crack Spiral, from 07 to 08 o'clock, within 8 inches of joint: YES, Start542.4 ft. B - Broken, from 07 to 08 o'clock, within 8 inches of joint: YES548.5 ft. CS - Crack Spiral, from 08 to 09 o'clock, within 8 inches of joint: YES, Start552.4 ft. CS - Crack Spiral, from 08 to 09 o'clock, within 8 inches of joint: YES, Finish560.2 ft. CS - Crack Spiral, from 07 to 08 o'clock, within 8 inches of joint: YES, Finish560.2 ft. FS - Fracture Spiral, from 08 to 09 o'clock, within 8 inches of joint: YES, Start566.1 ft. FS - Fracture Spiral, from 08 to 09 o'clock, within 8 inches of joint: YES, Finish575 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start577.4 ft. MGP - General Photograph590.1 ft. MGP - General Photograph590.1 ft. MGP - General Photograph602.4 ft. MGP - General Photograph649.1 ft. MGP - General Photograph733.1 ft. MGP - General Photograph740.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish740.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish740.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish745.3 ft. MGO - General Observation - Grease Throughout The Reach (5%)745.3 ft. AMH - Downstream Manhole, Survey Ends - 12:39 PM

Observation photos (25)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    27.8 ft. - General Photograph

  • General Photograph

    34.3 ft. - General Photograph

  • General Photograph

    42.1 ft. - General Photograph

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    51.2 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 10 to 12 o'clock, within 8 inches of joint: YES

    57.2 ft. - Crack Multiple, from 10 to 12 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    104.7 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • General Photograph

    300.1 ft. - General Photograph

  • General Photograph

    411.9 ft. - General Photograph

  • General Photograph

    448.5 ft. - General Photograph

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 10 to 02 o'clock,  , within 8 inches of joint: YES

    448.5 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES

  • General Photograph

    489.3 ft. - General Photograph

  • Material Change, Concrete pipe (non-reinfored) - START

    493.4 ft. - Material Change, Concrete pipe (non-reinfored) - START

  • Material Change, Concrete pipe (non-reinfored) - END

    495.2 ft. - Material Change, Concrete pipe (non-reinfored) - END

  • Crack Spiral, from 01 to 02 o'clock, within 8 inches of joint: YES, Start

    537 ft. - Crack Spiral, from 01 to 02 o'clock, within 8 inches of joint: YES, Start

  • Crack Spiral, from 07 to 08 o'clock, within 8 inches of joint: YES, Start

    542.4 ft. - Crack Spiral, from 07 to 08 o'clock, within 8 inches of joint: YES, Start

  • Broken, from 07 to 08 o'clock, within 8 inches of joint: YES

    542.4 ft. - Broken, from 07 to 08 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 08 to 09 o'clock, within 8 inches of joint: YES, Start

    548.5 ft. - Crack Spiral, from 08 to 09 o'clock, within 8 inches of joint: YES, Start

  • Fracture Spiral, from 08 to 09 o'clock, within 8 inches of joint: YES, Start

    560.2 ft. - Fracture Spiral, from 08 to 09 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    577.4 ft. - General Photograph

  • General Photograph

    590.1 ft. - General Photograph

  • General Photograph

    590.1 ft. - General Photograph

  • General Photograph

    602.4 ft. - General Photograph

  • General Photograph

    649.1 ft. - General Photograph

  • General Photograph

    733.1 ft. - General Photograph

Observations (40)

DistanceCodeObservation
2CM
300.1MGP
740.5CM
42.1MGP
537CS
27.8MGP
57.2CM
733.1MGP
649.1MGP
740.5CM
448.5MGP
448.5DAE
602.4MGP
489.3MGP
2SSS
560.2CS
0AMH9:31 AM
493.4MGP
104.7CL
411.9MGP
566.1FS
542.4CS
542.4CS
745.3MGOGrease Throughout The Reach (5%)
493.4MMCSTART
0.1MWM
590.1MGP
34.3MGP
495.2MMCEND
560.2FS
548.5CS
552.4CS
0.1MWL
577.4MGP
745.3AMH12:39 PM
740.5SSS
590.1MGP
542.4B
575CM
51.2CL

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2018-11-26T08:41:29-08:00
documentation
FRANKLIN, IGNACIO, RUVALCABA, CASTILLO
is_lateral_inspection
false