Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 28, 2017, 09:39 AM
  • 16 0552_16 0551 _28092017_023932.mp4

Date
09/28/2017
W/O
663060
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00659
PipeID
P13603
Time
2:39 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4279
Sewer Name
16 LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_663060_TV16078_OCT2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
16 0552
Downstream MH
16 0551
Dir. of Survey
Downstream
Length Surveyed
168.2 ft.
Total Length
168.2 ft.
Structural Index
3
Structural Quick
3F00
Structural Rating
99
O&M Index
2
O&M Quick
2F12
O&M Rating
68
Overall Index
2
Overall Quick
Overall Rating
167
Pipe schematic from manhole 16 0552 to 16 0551
MH: 16 0552MH: 16 0551downstream0 ft. VC - Vermin Cockroach0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 16 05520 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. MGO - General Observation - MAG COAT START20.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"25 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"64.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"104.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"129 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"133.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"166.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish166.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish166.6 ft. MGO - General Observation - MAG COAT FINISH168.2 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK MADE168.2 ft. VC - Vermin Cockroach168.2 ft. AMH - Downstream Manhole, Survey Ends - 16 0551

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
2.3DAGS
0VC
168.2MGOCONNECTION AT MH 9 O'CLOCK MADE
0MGOCONNECTION AT MH 9 O'CLOCK ACTIVE
168.2VC
133.6TFC
0AMH16 0552
166.5DAGS
166.6SAV
25TFC
129TFC
20.2TFC
2.3SAV
168.2AMH16 0551
0MWM
166.6MGOMAG COAT FINISH
2.3MGOMAG COAT START
104.8TFC
0MWL
64.3TF

Properties (6)

additional_info
SC352124
custom_field_two
3
customer
LACSD
datetime
2017-09-28T02:39:13-07:00
documentation
PRO PIPE
is_lateral_inspection
false